Vodafone

Vodafone

3 VODAFONE DURATION 2007-18 TOTAL POWER SUPPLIED 5250KVA LOCATION Throughout the UK This was a fantastic project to be involved with. Despite being a technically and logistically challenging installation, it really showcases our ability to work with major...
Royal Bank of Scotland

Royal Bank of Scotland

3 ROYAL BANK OF SCOTLAND DURATION 2007-18 TOTAL POWER SUPPLIED 5250KVA LOCATION Throughout the UK This was a fantastic project to be involved with. Despite being a technically and logistically challenging installation, it really showcases our ability to work with...
Manchester United

Manchester United

3 MANCHESTER UNITED FOOTBALL CLUB DURATION 2007-18 TOTAL POWER SUPPLIED 5250KVA LOCATION Manchester This was a fantastic project to be involved with. Despite being a technically and logistically challenging installation, it really showcases our ability to work...
American Express

American Express

3 AMERICAN EXPRESS DURATION 2012-18 TOTAL POWER SUPPLIED 5250KVA LOCATION Brighton   This was a fantastic project to be involved with. Despite being a technically and logistically challenging installation, it really showcases our ability to work with major...